
Heavy snow is coming, good news is coming! On the evening of December 16, the 200,000 tons/year bisphenol A unit of the Longjiang Chemical Polycarbonate Joint Project contracted by Saiding Company was successfully started up at the first time, successfully producing qualified bisphenol A products, and the entire process flow was completed.
Since the start of the project, all majors in the company have actively collaborated to ensure that the task nodes are completed as scheduled. The project team uniformly develops procurement plans through procurement, design and construction to ensure that construction requirements are met. At the same time, we constantly optimize the construction plan, resist the severe cold, seize the golden period of construction, coordinate the deployment of personnel, do a good job of goal decomposition, and actively organize all participating units to strive to achieve every construction node to ensure that the device is successfully commissioned on December 9.
All members of the Siding Bisphenol A project team have always adhered to the professional attitude of striving for excellence and down-to-earth professionalism, and have been fully recognized and highly praised by the owners. This device is another landmark project of Saiding Company after the Guangxi Huayi Bisphenol A plant. It marks the completion of an important link in Daqing's "oil head and tail" industrial chain, and also contributes to the high-quality development of Heilongjiang's industrial economy. The power of the tripod.