English
  • 中文
  • English

News

分类标题

Member login

  • E-mail *

  • Cipher *

  • Login

  • Security Code
    Refresh the code
    Cancel
    Confirm

Forget your password?

  • E-mail *

  • Send

  • Security Code
    Refresh the code
    Cancel
    Confirm

The total investment is 49.96 billion yuan! Environmental impact assessment announcement of large ethylene project with annual output of 1.6 million tons

BISNTE
Time: 2024-02-29

On February 23, the Guangdong Provincial Department of Ecology and Environment published an announcement on the acceptance of the environmental impact report of CNOOC Huizhou Phase III Ethylene Project on its website.

Project name: CNOOC Huizhou Phase III Ethylene Project


Construction unit: CNOOC and Shell Petrochemical Co., Ltd.


Type of construction: new construction


Construction scale: This project will build a total of 16 production units, including a 1.6 million tons/year ethylene unit, a 305,000 tons/year butadiene extraction unit, a 1.46 million tons/year pyrolysis gasoline hydrogenation unit, and a 1.1 million tons/year aromatics unit. Extraction unit, 645,000 tons/year ethylene oxide-ethylene glycol (EO-EG) unit, 600,000 tons/year metallocene linear low-density polyethylene (mLLDPE) unit, 400,000 tons/year linear α-olefins (LAO) unit, 130,000 tons/year isomerization and disproportionation (ID) unit, 130,000 tons/year Shell hydroformylation (SHF) unit, 50,000 tons/year poly alpha-olefin (PAO) unit, 50 10,000 tons/year polypropylene (PP) unit, 1 million tons/year ethylbenzene (EB) unit, 87.5/400,000 tons/year styrene-propylene oxide (SM-PO) unit, 450,000 tons/year polyether Polyol (DMC-POD) unit, 100,000 tons/year polymer polyol (POP-POD) unit, 270,000/80,000 tons/year MTBE/butene-1 unit, and supporting storage and transportation projects, public works, Auxiliary projects, environmental protection projects, etc.


Operating time: 8000h/a


Construction location: Daya Bay Petrochemical Industrial Park in Huizhou, Guangdong. The land for this project is divided into 4 plots. The D5D6 plot covers an area of 586,925 square meters, the E5 plot covers an area of 1,883,399 square meters, the B4B5 plot covers an area of 418,221 square meters, and CSPC II The reserved land area of the EF plot in the public works area in the first phase is 149,695 square meters, and the total land area of the four plots is 3,038,267 square meters. D5D6 plot and E5 plot are the main factory areas of the project.


Implementation plan and construction period: The construction period of this project is 36 months.


Total investment and environmental protection investment: The total investment of this project is 49.96022 billion yuan, the construction investment is 43.45903 billion yuan, the environmental protection investment is 3.51257 billion yuan, and the environmental protection investment accounts for 7.03%.


Main project: A total of 16 new production devices will be built in this project


Product plan: The products sold outside this project mainly include: 95 mol% hydrogen, propylene, butadiene, unhydrogenated C9, toluene, mixed xylene, raffinate oil, C9 and above aromatics, ethylene glycol, and high-purity epoxy Ethane, polyethylene resin, high purity hexene-1, octene-1, dodecene-1, tetradecene-1, hexadecene-1, octadecene-1, N91, N23, N45, HBS -150, PAO2, PAO4, PAO6, PAO8, polypropylene resin, styrene, polyether polyol (SC56-16S), polymer polyol, MTBE (methyl tert-butyl ether), butene-1, remaining C4 . The total amount of external sales products of this project is approximately 481.8408×104t/a.


CNOOC and Shell Petrochemical Co., Ltd. was established in 2000. It is one of the largest Sino-foreign joint venture petrochemical companies in China. The Chinese shareholder of CNOOC and Shell is CNOOC Petrochemical Investment Co., Ltd. (its shareholders are CNOOC Refining Co., Ltd. and Guangdong Guangdong Guangdong Petrochemical Co., Ltd. Industrial Investment Group Co., Ltd.), accounting for 50% of the shares; the foreign shareholder is Shell Nanhai Private Co., Ltd., accounting for 50% of the shares. CNOOC and Shell is located in Daya Bay Petrochemical Industrial Park, Huizhou City, Guangdong Province. It mainly produces olefins and other derivatives as basic chemical raw materials to supply the market, and provides customers with high-quality and excellent services; its products are widely used in agriculture, industry, construction, medicine and consumer goods and other fields. .


CNOOC and Shell currently have two phases of projects in operation, with a total ethylene production capacity of 1.95 million tons/year. It is currently one of the largest monomer ethylene plants in operation in China, providing more than 6 million tons of high-quality, diversified petrochemical products to the market every year.


Among them, the first phase of the CNOOC and Shell project was put into operation in early 2006. Its main facilities include 11 sets of production units and supporting public works, terminals, storage and transportation, and environmental protection facilities. The scale of the ethylene unit is 950,000 tons/year. The project has introduced 13 world-leading technologies, including Shell’s proprietary technology, and a management model in line with international standards for design, construction and operation, with an annual output of 2.8 million tons of chemical products to supply the market;


The second phase of the CNOOC and Shell project was put into operation in April 2018. The main facilities include 13 sets of production units and supporting public works, storage and transportation, and environmental protection facilities. The scale of the ethylene unit is 1 million tons per year. The project uses Shell’s proprietary 17 advanced domestic and foreign industry technologies, including OMEGA, SMPO and polyol technology, have further expanded the product range and improved overall energy efficiency. It can produce 4 million tons of chemical products annually to supply the market.


Click:
Like | 0
share
The total investment is 49.96 billion yuan! Environmental impact assessment announcement of large ethylene project with annual output of 1.6 million tons
On February 23, the Guangdong Provincial Department of Ecology and Environment p
Long by picture save/share

您好,需要我们为您做些什么?

  • Name *

  • Telephone *

  • Content

  • 提交

  • Security Code
    Refresh the code
    Cancel
    Confirm

National service hotline

+ 86-10-62978640

Toll-free hotline

National service mailbox

Marketing@bisnte.com

Please contact

Contact address

1813, 18th Floor, Building 5, Yard 1, 10th Street, Haidian District, Beijing

welcome

All rights reserved© BISNTE China Office-Bisnte (Beijing) Valve Co., Ltd. Beijing ICP for 2023003105

图片展示

Home     About us     Product     Download     News     Performance     Contact us     Register/Login

National service hotline

+ 86-10-62978640

Toll-free hotline

National service mailbox

Marketing@bisnte.com

Please contact

Contact address

1813, 18th Floor, Building 5, Yard 1, 10th Street, Haidian District, Beijing

welcome

Hello, what can we do for you?

  • Name *

  • Telephone *

  • Content

  • submit

  • Security Code
    Refresh the code
    Cancel
    Confirm

All rights reserved© BISNTE China Office-Bisnte (Beijing) Valve Co., Ltd. Beijing ICP for 2023003105

添加微信好友,详细了解产品
使用企业微信
“扫一扫”加入群聊
复制成功
添加微信好友,详细了解产品
我知道了